Terryville, CT

About This Project

This Terryville project covered the second floor: popcorn ceilings taken down and finished smooth, the old laminate flooring replaced with luxury vinyl plank, and the walls and trim repainted. No walls moved — the whole change came from surfaces.

We pulled the old flooring first and worked from the subfloor up. That order matters on a ceiling job: with the floor already out, scraping and skim-coating overhead doesn’t have to be babied, and the new plank goes down into a room that’s already finished. The vaulted section took the most time — two of us working it off extension ladders, skimming the sloped plane in coats, sanding between them, and cutting the finish in around the existing skylight well so the corners stayed crisp.

The new floor runs continuously from the bedroom through the doorway into the upstairs hall and across the stair landing, where it meets the original oak stair nosing that stayed put. Walls went a soft gray-blue against white trim and a smooth white ceiling.

Keep Exploring

More Like This Project

Flooring

Everything we do for flooring projects, including process and answers.

Painting

Everything we do for painting projects, including process and answers.

Popcorn Ceiling Removal

Everything we do for popcorn ceiling removal projects, including process and answers.

Remodeling in Terryville

What we work on in Terryville, local answers, and the services we bring there.

Financing Available on Larger Projects

Check your options online in about a minute with a soft credit pull, so your score is not affected. Fixed monthly payments on amounts from $500 to $200,000.

See Financing Options
Your Turn

Planning a Project Like This?

Tell us what you have in mind and we will come take a look. Estimates are always free and always in writing.